Whether you're looking for a gentle 30-minute walk or a challenging hike to the summit lookouts, our diverse trail network offers something for every fitness level
Walking trails include:
Apex Trail (3.5km circuit, 1hr 30mins)– This is the most accessible track which starts from the car park at the top of the Scenic Road. The trail includes interpretive signage and the Ningana, Kalang and Binjang lookouts.
Burrunggee Trail (4.6km return, 1hr 50mins)– A steeper, alternative route to the summit, this route also starts at the parking area and ascends the eastern face of Mount Arthur.
Bundari Trail (4km return, 1hr 50mins) – This trail starts about half-way up the Scenic Drive near the Landa Picnic Area. It is a longer trail with a few steep climbs through the foothills of the mountain and joins the Burrunggee Trail.
Bimberdong Trail (2.6km return, 1hr)– Beginning from the picnic area adjacent to the town's old reservoir, this trail ascends steeply to link with the Apex Trail.
Yarraman Trail (1.6km one way, 30mins)- a generally gentle trail along the lower slopes of Mt Arthur, between Bushranger's Creek Road and Brennan's Way and linking with the Bundari Trail.
Trig/Waterloo Trails (6.5km circuit, 3hrs)– This is a circuit for a bushwalker with plenty of time and a fair amount of energy. The trail starts and ends at Bushranger Creek Road opposite the picnic area near the Old Reservoir site and climbs to the television repeater station on Mount Wellesley.
When using any of the trails in the Reserve it is essential that you:
Carry drinking water
Wear appropriate clothing and footwear
Carry your litter out with you
Further information, including a colour brochure, can be found at the Wellington Visitor Information Centre, Nanima Cres, Wellington (1800 621 614)
Horse Riding: Permitted only on the Yarraman Trail (shared with walkers). Riders must have their own insurance. Fire trail access requires prior Land Manager approval. All other areas are strictly off-limits to horses.
Mountain Biking (CURRENTLY CLOSED): All MTB trails are closed pending a professional safety and sustainability review. Riding or building unauthorized trails/features is strictly prohibited until the new network is officially opened